The preferred spot would place the lean to under the overhanging roof of the existing building.
How to tie off on a metal roof.
Some older homes have tin.
That roof was originally built with flush rakes so we extended the rake overhangs on both sides to 24 inches putting the shed roof rake trim in plane with the fascia of the porch we were about to build.
Metal buildings pose the most difficulty due to their rigidity.
And materials that slip off the roof are a danger.
This video shows the transition of a shingle roof to a metal roof.
Whether you need a metal roof anchor for construction of a new building standard roof contracting installing a new hvac system or working in a waste management system metal roof anchors are pieces of equipment that make a huge difference.
Roofs peel off from the edges so it is critical to hold them tight with the roof deck sealed on the outside we turn to flashing the edges with metal and membranes metal drip edge flashing image details roofing wrb flashing.
Step 1 determine where the lean to will be attached to the existing building.
Working on any roof is dangerous and slick metal roofs with a steep pitch are particularly perilous.
How to tie a tin roof into the siding.
The most trusted miami roofing contractor professionally describes the installation of thi.
Tin roofs feature corrugated sheet metal installed with the grooves running downward to encourage water to drain off the roof.
Any water runoff will flow off of the main roof and hit the lean to at an angle to prevent pooling and.